ACME Logistics, Greer, SC
Complicated logistics is our comfort zone.
Timed deliveries. Installs. Storage. Routes that have to run every day. ACME builds the plan, runs it with its own people and trucks, and tells you what happened.

How ACME works
Map. Build. Run. Report. Every job, the same four moves.
The tools change. The method does not. This is what happens between "send us the problem" and your first weekly report.
1
Map
ACME sits with your team and maps the sites, the windows, the equipment, who signs, and what goes wrong today.
You get: a written picture of the problem.
2
Build
ACME picks the tools, sizes the crew and trucks, sets the calendar, and prices it with the assumptions listed. Nothing moves until you see the plan.
You get: the plan and the price on one page.
3
Run
ACME's people. ACME's trucks. ACME accountable. One person to call, who can change the plan the same day.
You get: a phone number that answers.
4
Report
What moved. What installed. What slipped, and why. What it cost against plan. Daily for installs, weekly for routes.
You get: the numbers before your boss asks.
Report, shown
This is what Friday looks like.
Every job ends the week with a report like this. Routes, stops, exceptions, cost against plan. When something slipped, the reason is in the row.
| Route | Stops | Completed | Exceptions | vs plan |
|---|---|---|---|---|
| Clinic rollout, week 3 | 14 sites | 14 installed | None | On plan |
| Night pharmacy run | 31 stops | 31 delivered | None | On plan |
| Plant milk run, Tue/Thu | 6 stops | 6 delivered | 1 late, dock closed | +0.4 hr |
| Hotel floors 4 to 6 | 3 floors | 3 delivered | None | On plan |
| Staged inventory | 412 units | 88 released | Count matched | 324 on hand |
Sample layout. The numbers are an example, not a customer's.
The cost of waiting
What the problem costs you while it stays unsolved
None of this shows up on a freight invoice. All of it shows up in your week.
Your ops manager running dispatch at 4 pm instead of their real job.
Three vendors on one project and nobody who owns it when the date moves.
Product in the wrong building, paid for twice: stored, then moved again.
A broker who solved it on paper and has no truck within 200 miles.
A Friday report you build yourself, from four sources, after the fact.
98%
On time. The other 2% called ahead.
99%
Customer satisfaction.
62
Years in business.
What ACME reaches for
Tools, not a menu.
Nobody buys "warehousing." They buy the remodel landing on time. These are the tools behind the plan.

Dedicated routes and truckload. Same trucks, same drivers, your run.
Courier and expedited. Same day, overnight, every night.
Warehousing and staging. Counted, tracked, released on your call.
White-glove delivery and install. Inside, assembled, set, old unit out.
Managed capacity. Brokered lanes under one accountable contact.
Reporting. Inventory by site, cost against plan, exceptions with reasons.
New-territory setup. A yard, a crew, and a manager where you need one.
Project freight. Plant moves, store openings, one-time hauls with a lot riding on them.
Try ACME on the problem you just thought of.
There is one. It came to mind two sections ago. Send that one. A plan comes back in a week, and if it is not worth your time, you lost a phone call.
